LA STM
This major project optimized space for the STM, which needed to maximize its vertical space and increase their storage capacity.
The challenge: the STM needed a high-performance, turnkey solution for high-density storage in one of their parts warehouses.
The solution: Our planning and technical drawing experts worked with our client to design a self-supporting, robust and safe mezzanine, depending on the space available. Our installation experts delivered a 3-level, 39,000 sq. ft. platform, which tripled the storage space.
Our client was then able to place shelves on this industrial quality structure.